Erwin Colcol | GMA News | viagra masculin femme November 22, 2016

Another technical problem with the Metro Rail Transit-3 (MRT-3), a broken rail, limited services Tuesday morning.

The Department of Transportation said in an advisory that a technical problem was detected at 6:12 a.m. at the northbound between Santolan/Annapolis and Cubao stations.

Southbound services were meanwhile limited to the Shaw Boulevard-Taft Avenue stations as of 6:20 a.m.

The MRT 3 operations went back to normal at 6:50 a.m. There were some 20 trains available to the MRT-3 at 7 a.m.