MRT3 Philippines Operation
.
LONGER WAITING TIME DUE TO:

• Longer train intervals
• Slow speed
• Fewer number of trains
P7.2 M GOVERNMENT SUBSIDY

• P48 subsidy for every P12-P15 one-way ticket prior to the fare hike last January 4, 2015
• All taxpayers pay for such subsidy
DOTC did not respond the proposal by MPIC to take over MRT operations including shouldering of expansion costs and billions in subsidy

MRT3 Philippines Operations